2015

CHALLENGE

Integrated project for large public hospital aiming to optimize energy efficiency and reduce operational costs.

MITSIDI’S ROLE

Participation in phases from Pre-Project to Project Execution.
Alignment of findings with architect and other stakeholders to ensure the implementation of efficiency measures in the projects.

RESULTS

  • 24% reduction in load of installed air conditioning;
  • Guarantee of thermal comfort using natural ventilation in area of 4.000 m²;
  • Evaluation of solar water heating systems and solar energy generation.