2015

CHALLENGE

Verify the reduction in consumption of energy proportioned for adapting the enclosure of the EPE’s headquarters, in Rio de Janeiro.

MITSIDI’S ROLE

Six simulation models with energy efficiency measures to evaluate the best technical approach proposed for the retrofit project.

RESULTS

  • Values submitted per appropriation request from PEE of ANEEL;
  • Simulation model with margin of error of only 4.2% in relation to actual consumption;
  • 16.9% energy savings realized with lighting and air conditioning retrofit.